Time between closing of 2012 c63 order bank and opening of 2013 c63 order bank?
#1
Senior Member
Thread Starter
Time between closing of 2012 c63 order bank and opening of 2013 c63 order bank?
The 2012 order bank for c63 is now closed.
Does anybody know the typical time lag between the closing of the order bank for 1 model year and the opening of the order bank for the new model year?
I know that last year the order banks for the 2012MY opened on March 17th...
I have an order in with the dealer a 2013 c63 and the wait is killing me -- it would help if I knew when the order could be placed in the order bank and when the build date and delivery date would be...
Does anybody have any inside knowledge for the 2013 c63???
Does anybody know the typical time lag between the closing of the order bank for 1 model year and the opening of the order bank for the new model year?
I know that last year the order banks for the 2012MY opened on March 17th...
I have an order in with the dealer a 2013 c63 and the wait is killing me -- it would help if I knew when the order could be placed in the order bank and when the build date and delivery date would be...
Does anybody have any inside knowledge for the 2013 c63???
#2
Junior Member
Join Date: Oct 2011
Location: Hong Kong
Posts: 67
Likes: 0
Received 0 Likes
on
0 Posts
F458
I am about to place an order for C63 coupe in HK and the order is for july as manufacture date. I was told by my dealer in HK that the order for june manufacture is already full unless I order a Black Series. I am guessing July is the beginning of the new model year but my dealer told me there is no difference in the spec for MY2012 and MY2013! Hope this helps !
#4
I am about to place an order for C63 coupe in HK and the order is for july as manufacture date. I was told by my dealer in HK that the order for june manufacture is already full unless I order a Black Series. I am guessing July is the beginning of the new model year but my dealer told me there is no difference in the spec for MY2012 and MY2013! Hope this helps !
#5
Senior Member
Thread Starter
I am about to place an order for C63 coupe in HK and the order is for july as manufacture date. I was told by my dealer in HK that the order for june manufacture is already full unless I order a Black Series. I am guessing July is the beginning of the new model year but my dealer told me there is no difference in the spec for MY2012 and MY2013! Hope this helps !
Anybody in North America have any more info about the 2013 c63 build dates?
#6
Junior Member
Join Date: Feb 2012
Posts: 56
Likes: 0
Received 0 Likes
on
0 Posts
GLK, future C63 owner
http://www.mbusa.com/mercedes/mbrace2
Trending Topics
#8
MBWorld Fanatic!
The options and stuff like engine specs won't change, but it's highly likely that at least electronics will get a change - for example, the mbrace2 system, which will replace the current mbrace system:
http://www.mbusa.com/mercedes/mbrace2
http://www.mbusa.com/mercedes/mbrace2
#9
#10
Junior Member
Join Date: Feb 2012
Posts: 56
Likes: 0
Received 0 Likes
on
0 Posts
GLK, future C63 owner
#11
Junior Member
Join Date: Oct 2011
Location: Hong Kong
Posts: 67
Likes: 0
Received 0 Likes
on
0 Posts
F458
but the wait seems to be shorter for BMW's (around 3 months)!
#14
MBWorld Fanatic!
Join Date: Feb 2010
Posts: 5,492
Received 430 Likes
on
353 Posts
2012 C63;1971 280SE 3.5(Sold);2023 EQS 450 SUV 4 Matic (Wife's)
I think it will be in that time frame maybe a little later. I don't think pricing and build details will be available that early and the earliest build dates will likely be July for September delivery.
If it is a new model then it is possible they might do an early introduction as a 2014 Model Year March to May period. Because it will be a continuation of a model rather than a totally new line they may stick with the more normal time frame. I think it will depend on how much of make over the line receives and maybe on what the competition is doing.
Have to wait and see at this point.
If it is a new model then it is possible they might do an early introduction as a 2014 Model Year March to May period. Because it will be a continuation of a model rather than a totally new line they may stick with the more normal time frame. I think it will depend on how much of make over the line receives and maybe on what the competition is doing.
Have to wait and see at this point.
#15
I'm considering ordering a 2013 C63, but this thread has raised a few more questions than answers. So, if I walk into my dealer tomorrow, can I order a 2013 C63? I am in the US.
Also, the posts directly above have me wondering, is th C-class expected to be redesigned for 2014?
Also, the posts directly above have me wondering, is th C-class expected to be redesigned for 2014?
Last edited by abingdon; 03-25-2012 at 10:48 PM.
#16
Senior Member
Thread Starter
2009 MY build dates started in June 2008, delivery mid-July
2011 MY build dates started in June 2010, delivery mid-July
I know that last build date for 2012 MY is 2nd decade June.
I have heard rumors that they shut down the AMG factory for a few weeks - month between model years but I'm not sure if this is true.
I also don't know if they might start building a few 2013s while they are building the last of the 2012s?
I wish somebody who worked inside of the AMG factory could chime in with some knowledge about 2013 c63 build dates...
#17
MBWorld Fanatic!
Join Date: Feb 2010
Posts: 5,492
Received 430 Likes
on
353 Posts
2012 C63;1971 280SE 3.5(Sold);2023 EQS 450 SUV 4 Matic (Wife's)
My source is not official. I have a friend that was a dealer till last fall and I got some idea of the order/delivery process from him and the rest is just what I have read of other peoples experiences and general interest.
Also, I don't think you are going to get any faster delivery than angusw has been quoted above no matter how bad you want it. Your dealer should be able to provide you with the inside information.
Also, I don't think you are going to get any faster delivery than angusw has been quoted above no matter how bad you want it. Your dealer should be able to provide you with the inside information.
#18
yeah , the tax is high. Also in hk I always see no young people driving C63 but here I see C63 all around in high school, college parking lot
#21
MBWorld Fanatic!
Join Date: Feb 2010
Posts: 5,492
Received 430 Likes
on
353 Posts
2012 C63;1971 280SE 3.5(Sold);2023 EQS 450 SUV 4 Matic (Wife's)
I think it was released in 2007 as a 2008 model year offering. If that is correct then the C63 will be 6 model years old in the fall as 2013 model year.
#22
So the next generation will be reviled in the summer of 2014 with retail sales happening spring 2015. Assuming they follow previous generations release schedule.
So the 2014 will still be a w204.
So the 2014 will still be a w204.
#23
Junior Member
Join Date: Oct 2011
Location: Hong Kong
Posts: 67
Likes: 0
Received 0 Likes
on
0 Posts
F458
#24
Senior Member
Thread Starter
I can answer my own questions now!!!
The 2012 order bank for c63 is now closed.
Does anybody know the typical time lag between the closing of the order bank for 1 model year and the opening of the order bank for the new model year?
I know that last year the order banks for the 2012MY opened on March 17th...
I have an order in with the dealer a 2013 c63 and the wait is killing me -- it would help if I knew when the order could be placed in the order bank and when the build date and delivery date would be...
Does anybody have any inside knowledge for the 2013 c63???
Does anybody know the typical time lag between the closing of the order bank for 1 model year and the opening of the order bank for the new model year?
I know that last year the order banks for the 2012MY opened on March 17th...
I have an order in with the dealer a 2013 c63 and the wait is killing me -- it would help if I knew when the order could be placed in the order bank and when the build date and delivery date would be...
Does anybody have any inside knowledge for the 2013 c63???
1 week
I have an order in with the dealer a 2013 c63 and the wait is killing me -- it would help if I knew when the order could be placed in the order bank and when the build date and delivery date would be...
Today
June 2nd decade build date
Delivery Date mid-late July
MB Release projected to be on July 15th
Oh, and Mbrace2 is standard.
#25
MBWorld Fanatic!
just want to let everyone know that you cannot get mbrace2 in 2012 models...so if you can hold off to get the 2013, I would do it! mbrace2 seems to be very cool.