E-Class (W213) 2016 - 2023

Build date

Old 01-02-2017, 11:43 AM
  #1  
Member
Thread Starter
 
dukester34's Avatar
 
Join Date: Nov 2016
Posts: 227
Received 23 Likes on 17 Posts
none yet
Build date

a place for folks to update us all on the progress

I ordered on December 27 they said 6-8 weeks no build date yet.
Old 01-02-2017, 12:05 PM
  #2  
Senior Member
 
mjsbenz's Avatar
 
Join Date: Aug 2005
Location: Florida & New Jersey
Posts: 344
Received 44 Likes on 33 Posts
2017 E300 4matic Sport
Ordered my E300 on October 10th. Was not built until December 9th because of pano roof and 19 wheels backlog. Loaded on the vessel December 21st. ETA to port in Baltimore on January 8th (3 day delay since loading).

Hopefully 10 days after, dealer should have it delivered to me.
The following users liked this post:
dukester34 (01-02-2017)
Old 01-02-2017, 01:11 PM
  #3  
MBWorld Fanatic!
 
HBerman's Avatar
 
Join Date: Feb 2007
Location: Cary, NC
Posts: 2,161
Received 551 Likes on 376 Posts
2024 AMG EQE SUV , 2021 E63S Wagon - gone, 2018 E63S Sedan - gone
Originally Posted by mjsbenz
Ordered my E300 on October 10th. Was not built until December 9th because of pano roof and 19 wheels backlog. Loaded on the vessel December 21st. ETA to port in Baltimore on January 8th (3 day delay since loading).

Hopefully 10 days after, dealer should have it delivered to me.
Good luck with your delivery!
The following users liked this post:
mjsbenz (01-02-2017)
Old 01-04-2017, 10:00 PM
  #4  
Member
 
Drano64's Avatar
 
Join Date: Mar 2012
Location: Scottsdale, Arizona
Posts: 104
Received 15 Likes on 12 Posts
2018 GLC43
Ordered Dec 29th, production date Jan 25th. Can't wait
Old 01-04-2017, 10:55 PM
  #5  
Member
Thread Starter
 
dukester34's Avatar
 
Join Date: Nov 2016
Posts: 227
Received 23 Likes on 17 Posts
none yet
Originally Posted by Drano64
Ordered Dec 29th, production date Jan 25th. Can't wait
sounds great how long after you ordered did it take to get your production date ??? also cant wait
Old 01-04-2017, 11:05 PM
  #6  
Member
 
Drano64's Avatar
 
Join Date: Mar 2012
Location: Scottsdale, Arizona
Posts: 104
Received 15 Likes on 12 Posts
2018 GLC43
I get my cars thru Keyes European in Van Nuys. They gave me the production date the same day. I'm sure its a dealer order that they tweak to my specs. My 14 ML was the done the same way.
Old 01-04-2017, 11:58 PM
  #7  
Member
 
Sunrose305's Avatar
 
Join Date: Dec 2016
Posts: 200
Received 50 Likes on 34 Posts
2017 E300 Sport
Placed order 12/28 - told six to eight weeks.
2017 E300
Sport pkg
Grey exterior
Macchiato Beige/Black MB-Tex
Designo Magnolia "Flowing Lines" wood
18" 5-Spoke wheels
Premium 3 package
Burmester Sound System
Air Body Control
2nd 12'3" display
Acoustic Comfort Package
Old 01-05-2017, 10:16 AM
  #8  
Super Member
 
BeachBunny's Avatar
 
Join Date: May 2014
Location: Florida
Posts: 620
Received 62 Likes on 52 Posts
2018 E300 Luxury - P3 and more
I was at the dealer (again...) and they're still showing open production slots for late January. The dealerships can SEE the production slots on NetStar immediately and continually. There's no reason they couldn't have told you this information unless there's an option you ordered which is backordered.
Old 01-05-2017, 10:32 AM
  #9  
Super Member
 
ngerstman's Avatar
 
Join Date: Dec 2010
Location: New Jersey
Posts: 908
Likes: 0
Received 17 Likes on 13 Posts
2016 Audi S8 Plus/ 2011 Mercedes e550 4Matic//Gone:1985 500SEL/2000 e320 4Matic/ 2001 e55 Kleeman
I ordered my e43 loaded in October, now being told build date of January 19. I hadn't ordered a new car to spec since my 2001 e55. I assumed build date was when they started production of car, now told its when its expected to be done, go know! Regards. Ned.
Old 01-05-2017, 10:56 AM
  #10  
Member
 
Sunrose305's Avatar
 
Join Date: Dec 2016
Posts: 200
Received 50 Likes on 34 Posts
2017 E300 Sport
How many days should one expect between "build date" and "delivery date" for an east coast car? Ultimately the only date that really matters is the date I can drive the car off the dealer's lot.
Old 01-05-2017, 11:08 AM
  #11  
MBWorld Fanatic!
 
ua549's Avatar
 
Join Date: Nov 2014
Location: Clearwater, Florida
Posts: 4,175
Received 770 Likes on 608 Posts
.
Ocean transport time can vary significantly. I've had cars waiting to be loaded at the port for more than a week or loaded immediately. Depending on the cargo ships may make en-route port calls before arriving in the US. When you know the ship you car will be on you can then view the ship's route and schedule.
Old 01-05-2017, 11:36 PM
  #12  
Member
Thread Starter
 
dukester34's Avatar
 
Join Date: Nov 2016
Posts: 227
Received 23 Likes on 17 Posts
none yet
Originally Posted by dukester34
a place for folks to update us all on the progress

I ordered on December 27 they said 6-8 weeks no build date yet.
now today 01/05/16 got a call from the dealer telling me that orders with the P3 pkg specifically the distronic plus is delayed. they are hoping for a early march build for a early may delivery that's a 5 month wait...
anyone else in the US being told this
Old 01-06-2017, 01:31 PM
  #13  
Junior Member
 
Beam's Avatar
 
Join Date: Dec 2016
Posts: 26
Received 2 Likes on 2 Posts
2017 E-Class
Cool

Originally Posted by dukester34
now today 01/05/16 got a call from the dealer telling me that orders with the P3 pkg specifically the distronic plus is delayed. they are hoping for a early march build for a early may delivery that's a 5 month wait...
anyone else in the US being told this
Well, I tried to order E300 with P03 and 2nd screen for instrument cluster beginning of August.
Initially, I was told the car will be delayed due to shortage of P03 and in particular the HUD (therefore Q03 was an option which is P03 without HUD). With P03, I was told it will be build in October. In October the dealer told me the car was built as expected, but retracted a few days later saying that the MB factory ran out of the 2nd screens for the instrument cluster. I was told that I could probably expect the car in February instead, that is 7 months form order to delivery (and it was still no firm commitment).
Therefore, I did some more research (almost ending up with a lease for a 5 series BMW instead) and found a car at another dealer that was almost same specs. as the one I ordered. So I ended up canceling the order and bought the car from the other dealer instead......
Sorry, not really a happy ending and probably does not help you much but I share your frustration with MB lack of visibility in the process (I never had that problem with my BMWs )....
The following users liked this post:
dukester34 (01-06-2017)
Old 01-06-2017, 08:29 PM
  #14  
Newbie
 
sc01's Avatar
 
Join Date: Nov 2016
Posts: 14
Received 2 Likes on 2 Posts
gs350
I live in Asia and has been trying to order w213 with drive pilot.
The dealer had been refusing to accept w213 orders with drive pilot, saying it's not available due to limited manufacturing capacity.

This past week my sales called me and told me that my order was finally accepted with build date in March. She also showed me a screenshot of the MB ordering system.


Originally Posted by dukester34
a place for folks to update us all on the progress

I ordered on December 27 they said 6-8 weeks no build date yet.
The following users liked this post:
dukester34 (01-06-2017)
Old 01-06-2017, 08:45 PM
  #15  
Junior Member
 
johnmc1's Avatar
 
Join Date: Nov 2016
Location: Chicago IL Area
Posts: 56
Received 8 Likes on 8 Posts
2017 300E
After reading all these unpleasant experiences these customers have had (me included) with the MB ordering, manufacturing, poor parts supply chain, cars being held at shipping ports for repairs, deferred delivery dates because of faulty car systems, and on and on, I'm beginning to think MB is an organization that can't deliver what it promises and offers for sale. How long has the E300 been in development and ?....and they still don't have it figured out. What does that say about the engineering and testing systems? Maybe it's just time to look elsewhere for a car because it looks to me like the silver star is under some very dark clouds.
Old 01-07-2017, 08:59 PM
  #16  
Newbie
 
sc01's Avatar
 
Join Date: Nov 2016
Posts: 14
Received 2 Likes on 2 Posts
gs350
I hope the delay is due to manufacturing capacity, and not due to repairs/reworks.....

Originally Posted by johnmc1
After reading all these unpleasant experiences these customers have had (me included) with the MB ordering, manufacturing, poor parts supply chain, cars being held at shipping ports for repairs, deferred delivery dates because of faulty car systems, and on and on, I'm beginning to think MB is an organization that can't deliver what it promises and offers for sale. How long has the E300 been in development and ?....and they still don't have it figured out. What does that say about the engineering and testing systems? Maybe it's just time to look elsewhere for a car because it looks to me like the silver star is under some very dark clouds.
Old 01-07-2017, 09:12 PM
  #17  
MBWorld Fanatic!
 
dieseldoc's Avatar
 
Join Date: May 2008
Posts: 2,235
Received 159 Likes on 150 Posts
2016 GLC300 Dakota Brown on Espresso Brown Leather, 2014 C250 Sport Diamond Silver
MB can deliver. I ordered my GLC300 without having ever seen a car in person. The car had just been announced for the US market. Dealer had not received any cars. Dealer placed order in Netstar in November 2015. I ordered a fully loaded vehicle without a problem. Got it the end of Feb 2016. Car came from Bremen factory to Brunswick VPC to Texas. No delays.
Old 01-13-2017, 03:00 PM
  #18  
Junior Member
 
johnmc1's Avatar
 
Join Date: Nov 2016
Location: Chicago IL Area
Posts: 56
Received 8 Likes on 8 Posts
2017 300E
Now its ETA of about mid-February...this makes it 6 months from time I ordered w/ dealer.
Old 01-13-2017, 03:28 PM
  #19  
Newbie
 
steve_0's Avatar
 
Join Date: Jan 2017
Location: Florida
Posts: 14
Received 0 Likes on 0 Posts
17 E300
I placed an order on January 7th and it was slotted to arrive early March but added pano sunroom on the 11th and that pushed to a new slot with expected deliver about 3 weeks later, sometime late March/first week of April.

Black/Black E300
Sport wheel pack
19" AMG wheels
Rear deck spoiler
Panoramic roof
leather
Premium 2

Nothing too out of the ordinary but the roof did set it back some.
Old 01-29-2017, 07:32 PM
  #20  
Junior Member
 
johnmc1's Avatar
 
Join Date: Nov 2016
Location: Chicago IL Area
Posts: 56
Received 8 Likes on 8 Posts
2017 300E
6 Months

Originally Posted by johnmc1
Now its ETA of about mid-February...this makes it 6 months from time I ordered w/ dealer.
My E300 arrived at the port in Baltimore on 1/28/17 after 2 weeks on the water...6 month order-to-delivery time frame seems to be holding up. More to follow....
Old 02-02-2017, 06:37 PM
  #21  
Junior Member
 
johnmc1's Avatar
 
Join Date: Nov 2016
Location: Chicago IL Area
Posts: 56
Received 8 Likes on 8 Posts
2017 300E
Smile E300 Delivery In Sight

Originally Posted by johnmc1
My E300 arrived at the port in Baltimore on 1/28/17 after 2 weeks on the water...6 month order-to-delivery time frame seems to be holding up. More to follow....
Dealer has my E300!!! Will pick up tomorrow-- 2/3/2017--8 days short of 6 months after placing order.
Old 02-02-2017, 06:42 PM
  #22  
Member
 
Sunrose305's Avatar
 
Join Date: Dec 2016
Posts: 200
Received 50 Likes on 34 Posts
2017 E300 Sport
Originally Posted by johnmc1
Dealer has my E300!!! Will pick up tomorrow-- 2/3/2017--8 days short of 6 months after placing order.
Congratulations John! Looking forward to your driving/tech impressions and I'd also love to hear what they try to sell you on delivery.
Old 02-02-2017, 07:46 PM
  #23  
MBWorld Fanatic!
 
c4004matic's Avatar
 
Join Date: Oct 2014
Location: WI
Posts: 4,277
Received 1,059 Likes on 699 Posts
17 E43; 21 GLS580
Originally Posted by johnmc1
Dealer has my E300!!! Will pick up tomorrow-- 2/3/2017--8 days short of 6 months after placing order.

6 mts!!! WTF??? Did you order Back to the Future package or are they build it on Mars?
Old 02-02-2017, 07:50 PM
  #24  
Member
Thread Starter
 
dukester34's Avatar
 
Join Date: Nov 2016
Posts: 227
Received 23 Likes on 17 Posts
none yet
Originally Posted by johnmc1
Dealer has my E300!!! Will pick up tomorrow-- 2/3/2017--8 days short of 6 months after placing order.

congrats pictures pictures pictures
Old 02-03-2017, 10:22 AM
  #25  
Member
Thread Starter
 
dukester34's Avatar
 
Join Date: Nov 2016
Posts: 227
Received 23 Likes on 17 Posts
none yet
Anybody got an update on their order with the P3 PKG being delayed

Thread Tools
Search this Thread
Rate This Thread
Rate This Thread:
You have already rated this thread Rating: Thread Rating: 0 votes,  average.

Quick Reply: Build date



All times are GMT -4. The time now is 08:19 AM.