redragn
May 25, 2016
Its coming along!! Lots of lines, switches and wiring need to be run. KC ice box. Then CF Gruppe M intake will be installed. NOS purge through the CF hood vents. Remaining exhaust system needs to be bolted together with the cutout. Front and rear lights. Cage to be put in. And finally the widebody.
Original Thread
Full Weistec build and much more on 2009 C63More About This Picture
Vehicle
N/A
Location
N/A
Keywords
N/A
Discover More Pictures
See MoreAdvertisement
Be the first to comment on this picture!