2019 g550 "critical" code build time
#1
2019 g550 "critical" code build time
Ordered and waiting impatiently for my g550. The vehicle has moved from yellow to pink(critical code) via the salesman updates. Salesman has been grossly off for arrival times prior. Any idea/experiences on how long the vehicle takes to build/ship at this juncture?
thanks
thanks
#2
MBWorld Fanatic!
The color progression is from Blue (Changes OK) - to Yellow (Will Close To Changes Very Soon) to Red/Pink (No Changes Allowed).
At each stage there is a "Build Decade" for Blue and Yellow - and on Red/Pink that will be assigned a Build Date sometime after turning Pink/Red.
So - long story short - ask your Sales Advisor what Build Date shows on the PO.
At each stage there is a "Build Decade" for Blue and Yellow - and on Red/Pink that will be assigned a Build Date sometime after turning Pink/Red.
So - long story short - ask your Sales Advisor what Build Date shows on the PO.
#4
MBWorld Fanatic!
Then it get built - shipped to port - loaded on ship at port - then ocean to whichever port is used for your dealer.
You can get all that info from your salesman - and salesman can give you vessel name when loaded - and online you can track that cruise !
You can get all that info from your salesman - and salesman can give you vessel name when loaded - and online you can track that cruise !