Production question
#2
MBWorld Fanatic!
Then, at the VPC, if your car does not have any issues, it can take from a few days to a week or so depending on how far your dealer is from the VPC and whether you are in the beginning of the various drop-offs or at the end.
#5
Quick question, from the time an allotted build date starts, lets say June 1 for simplicity sake, about how many days does it take to complete the car, then ship it and arrive at a dealership in the east coast?
#7
My 2015 S550 just reached B8 after a week and is assigned to a ship. My dealer says he cannot see the ship name yet but I have a VIN number and when I try tracking on the WWL site it does not show up. My VPC is in Brunswick, GA. I am not sure if this normal or not?
Trending Topics
#8
MBWorld Fanatic!
Getting close now!
#9
Newbie
Join Date: May 2014
Location: South Africa
Posts: 9
Likes: 0
Received 0 Likes
on
0 Posts
E300
I ordered mine 7 Feb. According to official MB vehicle status report supplied by the dealer on 2 April, construction was in March and vehicle was on the vessel to SA for delivery between 28 Apr and 5 May. Delivery didn't took place and after lots of questions I got a new official status from the dealer today with delivery date set for Jun 4! 5 weeks delay and being weekend I didn't manage to get any proper answer from the dealer as to what is going on now. What happened to my vehicle that was shown to be on the vessel? I really don't know what to think about this. I don't have a VIN number or anything else. Just the official MB quote/configuration number that shows still the same with the manufacturing date still shown as March. I've requested the shipping line and Bill of Lading details but the dealer ( one of the largest in SA) is not very competent in answering even much more trivial questions so I have little hope to get this info.
All I can think is that my vehicle has been delayed by another vehicle propably for the same dealer. 2 weeks for production + 3 weeks voyage to SA and that may explain the 5 weeks delay. I feel so disappointed.
All I can think is that my vehicle has been delayed by another vehicle propably for the same dealer. 2 weeks for production + 3 weeks voyage to SA and that may explain the 5 weeks delay. I feel so disappointed.
#10
MBWorld Fanatic!
I ordered mine 7 Feb. According to official MB vehicle status report supplied by the dealer on 2 April, construction was in March and vehicle was on the vessel to SA for delivery between 28 Apr and 5 May. Delivery didn't took place and after lots of questions I got a new official status from the dealer today with delivery date set for Jun 4! 5 weeks delay and being weekend I didn't manage to get any proper answer from the dealer as to what is going on now. What happened to my vehicle that was shown to be on the vessel? I really don't know what to think about this. I don't have a VIN number or anything else. Just the official MB quote/configuration number that shows still the same with the manufacturing date still shown as March. I've requested the shipping line and Bill of Lading details but the dealer ( one of the largest in SA) is not very competent in answering even much more trivial questions so I have little hope to get this info.
All I can think is that my vehicle has been delayed by another vehicle propably for the same dealer. 2 weeks for production + 3 weeks voyage to SA and that may explain the 5 weeks delay. I feel so disappointed.
All I can think is that my vehicle has been delayed by another vehicle propably for the same dealer. 2 weeks for production + 3 weeks voyage to SA and that may explain the 5 weeks delay. I feel so disappointed.
I wouldn't be a happy camper.
Last edited by LovinMercedes; 05-10-2014 at 02:39 PM.
#11
Newbie
Join Date: May 2014
Location: South Africa
Posts: 9
Likes: 0
Received 0 Likes
on
0 Posts
E300
Yes I feel like crying. Especially after they told me on Apr 30th that everything was still on track and that the vehicle is expected at customs between 1-3 May. Shortly thereafter everything became very confusing and cloudy. Rolling date on their system still shows 1 May but delivery date now pushed forward with 5 weeks. Still hoping for a human error somewhere and that Monday may bring better news.
#12
Newbie
Join Date: May 2014
Posts: 4
Likes: 0
Received 0 Likes
on
0 Posts
2015 S550 4Matic, '12 Porsche Turbo S Cabrolet, '09 Ferrari F430 Spider, '12 Toyota Sequoia Platinum
My car build was scheduled to start the 28th of April. I got word from my dealer that the car was at the dock on May 2nd. It is currently on the boat and scheduled to arrive in Baltimore on the 14th of May. My dealer says 3-5 days after it arrives in Baltimore it should be at the dealership in Ohio. So, from start of build to delivery, mine should take 3 weeks.....hopefully. I have had experiences with this before however, I ordered a Ferrari back in '08 with the commitment date of April 15th from the dealership and I did not receive the car until July 5th. They ended up putting it on a plane and delivering it to the US to expedite the delivery.
#14
Senior Member
Join Date: Oct 2013
Posts: 316
Likes: 0
Received 7 Likes
on
4 Posts
2014 S550, 2011 E350 Cabriolet, Asgard Mothership
My car was on the ship to Brunswick for 13 days as the ship stopped in Halifax enroute to Brunswick. It was exactly one week from the time the ship docked to it was at the dealer in Tampa. That seems to be typical from other reports on MBWorld but I understand other factors can affect the schedule.