2015 E63 Wagon Stuck in B1?




I've ordered my 2015 E63 Wagon when the build slots opened up in early July. My car has been in B1 status with an original estimate of a 09/2D (September 2nd Decade) build date.
About a week after I was assigned my PO it was upgraded to 09/1D (September 1st Decade) build date. Now that we are in September my car is still stuck in B1. I'm kind of expecting the worst and guessing that my build will slip to a later estimated production date. I got this list of the B codes but I'm not sure if they're 100% accurate:
B0 19 Days to Production
B1 13 Days to Production
B3 NO CHANGES POSSIBLE
B4 2 Days to Completion
B5 Production Complete
B7 At Port/Ready To Be Shipped
B8 Assigned to Ship
If the above list is true, then I would already miss the 1st Decade of September. Any ideas would be great as I don't like being left in the dark and wondering.
As a note my car will have designo paint, interior, and trim so maybe that's what's causing the issues? But even so, it should have locked into B3 by now.
Thanks!




I'm thinking kart125 may be right especially having gone through this process twice. But wouldn't your order be locked to B3 before your estimated build decade starts? When did it lock in for your two wagons?




My salesperson contacted distribution where all I was told is that my car should change to B3 within a couple weeks. **shrug**


