C Class (W205) C 180 BlueTec,C 200 BlueTec,C 220 BlueTec,C 220 BlueTec BlueEfficiency,C 250 BlueTec,C 300 BlueTec Hybridplus,C 180,C 180 BlueEfficiency,C 200,C 250,C 300,C 400 Plug-in Hybrid,C 400

how long it usually takes for a SA to change an order to a different model?

Thread Tools
 
Search this Thread
 
Rate Thread
 
Old Jul 26, 2016 | 01:45 PM
  #1  
hans007's Avatar
Thread Starter
Member
 
Joined: Aug 2008
Posts: 240
Likes: 8
2013 BMW 328i
how long it usually takes for a SA to change an order to a different model?

I decided to go sedan instead of coupe, and already had a coupe on order (which wasn't going to be built until early september) and wanted to change it to basically an identical sedan.

Has anyone had to have their SA do something like that, and is it usually pretty quick? I was hoping to still get my car in october or so
Reply
Old Jul 26, 2016 | 01:57 PM
  #2  
alexasa's Avatar
MBWorld Fanatic!
5 Year Member
Liked
Loved
Community Favorite
iTrader: (1)
 
Joined: Mar 2016
Posts: 3,263
Likes: 701
c
I think it depends on dealer allocations more so than anything.

So let's say they had an unspoken car on it's way, still within time range of spec being changed. You will be allocated this car and could possibly get it even sooner.

If the dealership does not have any available allocations, it might take longer unless you push them to trade allocations with another dealership. This might work in your case, because you have the coupe as an offer to the other dealership with a customer possibly waiting for a coupe allocation.
Reply
Old Jul 26, 2016 | 02:05 PM
  #3  
inhartwetrust's Avatar
Super Member
 
Joined: Aug 2015
Posts: 987
Likes: 66
.
All depends what allocations he can find and secure for you on a sedan rather than a coupe. Turnaround time will depend how quickly he is able to find/trade for the sedan allocation.

edit: didn't see alex's response, pretty much exactly what he said...
Reply
Old Jul 26, 2016 | 02:55 PM
  #4  
hans007's Avatar
Thread Starter
Member
 
Joined: Aug 2008
Posts: 240
Likes: 8
2013 BMW 328i
ah i see allright sounds like that probably won't be too bad. i figure the coupe would have taken longer in shipping anyway, so maybe itll all just work out
Reply

Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 


You have already rated this thread Rating: Thread Rating: 0 votes,  average.


All times are GMT -4. The time now is 07:20 AM.

story-0
6 Mercedes Models That Did NOT Age Well (But Are Somehow Still Cool)

Slideshow: Not every Mercedes design becomes timeless, some feel stuck in the era they came from.

By Verdad Gallardo | 2026-05-12 18:09:07


VIEW MORE
story-1
Manual Mercedes? 6 Times Sindelfingen Let Drivers Have All The Fun

Slideshow: Yes, Mercedes built manual cars, and some of them are far more interesting than you'd expect.

By Verdad Gallardo | 2026-05-02 12:36:58


VIEW MORE
story-2
Mercedes SLR McLaren 722 S Is Extremely Rare Example Modified by McLaren

Slideshow: A one-of-one U.S.-spec Mercedes-Benz SLR McLaren Roadster became even rarer after a factory-backed transformation at McLaren's headquarters.

By Verdad Gallardo | 2026-04-29 11:19:28


VIEW MORE
story-3
8 Classic Boxy Mercedes Designs That Have Aged Like Fine Wine

Slideshow: Before curves took over, Mercedes mastered the art of the straight line, and some of those shapes still look right today.

By Verdad Gallardo | 2026-04-25 12:05:49


VIEW MORE
story-4
Flawlessly Restored Mercedes 190E Evo II Heads to Auction

Slideshow: The 190E Evolution II shows how a homologation necessity became a six-figure collector icon.

By Verdad Gallardo | 2026-04-22 17:53:47


VIEW MORE
story-5
Electric Mercedes C-Class Unveiled: 11 Things You Need to Know

Slideshow: Mercedes is turning one of its core nameplates electric, and the details show just how serious this shift is.

By Verdad Gallardo | 2026-04-21 13:58:06


VIEW MORE
story-6
Mercedes EQS Gets A Major Update: Everything You Need to Know

Slideshow: Faster charging, longer range, and a controversial steer-by-wire system define the latest evolution of Mercedes-Benz EQS.

By Verdad Gallardo | 2026-04-15 10:35:34


VIEW MORE
story-7
5 Underrated Mercedes-Benz Models That Don't Get the Love They Deserve

Slideshow: These overlooked Mercedes-Benz models never got the spotlight, but they quietly delivered more than most remember.

By Verdad Gallardo | 2026-04-13 19:35:45


VIEW MORE
story-8
Mercedes 300D Has Pushed Well Past 1 Million Miles and It Ain't Stopping

Slideshow: A well-used 1991 Mercedes-Benz 300D with more than one million miles is now looking for a new owner, and it still appears ready for more.

By Verdad Gallardo | 2026-04-10 10:05:15


VIEW MORE
story-9
10 Most Reliable Mercedes-Benz Models You Can Buy Used

Slideshow: From bulletproof sedans to surprisingly tough SUVs, these Mercedes models proved that the three-pointed star can go the distance.

By Verdad Gallardo | 2026-04-08 09:55:49


VIEW MORE