Flood in Graz seems to have delayed 2022
I have heard that the Graz factory was flooded in July/August and Mercedes had to throw away a lot of parts for the G-wagon.
https://www.gismeteo.com/news/elemen...-last-century/
This is the reason why g-wagons are delayed and won't be available not just in the US for a while.
The g-wagons that are currently being shipped were already at the dock.
Semiconductor shortage is expected to be over by 2Q of '22, so we can expect g-wagons to start selling after that as soon as the political issues are fixed.




I have heard that the Graz factory was flooded in July/August and Mercedes had to throw away a lot of parts for the G-wagon.
https://www.gismeteo.com/news/elemen...-last-century/
This is the reason why g-wagons are delayed and won't be available not just in the US for a while.
The g-wagons that are currently being shipped were already at the dock.
Semiconductor shortage is expected to be over by 2Q of '22, so we can expect g-wagons to start selling after that as soon as the political issues are fixed.
As for semiconductor shortage, the estimates are all over the place for when it will be over. I've heard some theories that it won't be over until '23
- "Internet Conjecture" can be "seemingly logical fantasy" - FakeNews








