We finally are settled in to our new 6000 sq. ft. facility. We've been under construction for almost 3 months. The warehouse was a brand new unit with basically no walls, just concrete so we had a ton of work to do:
What our new facility means to our customers:
• Faster turnaround as we are now in full control of our product from start to finish.
• Better quality control, with our full in house finishing department we can control the quality of our finishing, and make sure everything is 100%. We don't focus on production line fast turnaround, but rather individual attention to detail on every part.
• In house carbon fiber department means no 3 month wait for our CF Forged carbon fiber wheels. Now that we have taken the process in house we can complete the process in only 1 week after the centers are machined.
• In house wheel repair and refinishing, you can change your finish or send us a damaged wheel for full warranty covered labor instead of sending your wheels to a body shop or other wheel refinishing type company and voiding your warranty.
Here's my office mid way through - with the walls up and stained concrete floors:

Here it is all finished:



Here's one of the other offices where our secretary and sales / production team work:
Before:

After:



What our new facility means to our customers:
• Faster turnaround as we are now in full control of our product from start to finish.
• Better quality control, with our full in house finishing department we can control the quality of our finishing, and make sure everything is 100%. We don't focus on production line fast turnaround, but rather individual attention to detail on every part.
• In house carbon fiber department means no 3 month wait for our CF Forged carbon fiber wheels. Now that we have taken the process in house we can complete the process in only 1 week after the centers are machined.
• In house wheel repair and refinishing, you can change your finish or send us a damaged wheel for full warranty covered labor instead of sending your wheels to a body shop or other wheel refinishing type company and voiding your warranty.
Here's my office mid way through - with the walls up and stained concrete floors:

Here it is all finished:



Here's one of the other offices where our secretary and sales / production team work:
Before:

After:



MBWorld Fanatic!
Looks Fantastic 



You are on the right track Jordan, well deserved.
Lovin the brown suede and matching carpet.
The in house wheel repair sounds great.
You are on the right track Jordan, well deserved.
Lovin the brown suede and matching carpet.
The in house wheel repair sounds great.
Senior Member
wow Jordan!! Everything came out perfect! Congratulations on the completion, and on your success! all the best!
Senior Member
Congrats on the new office...makes me want to work there.
Vic55
Administrator
close
- Join DateNov 2001
- LocationTHE Orange County, California
- Posts:12,263
-
iTrader Positive Feedback0
-
iTrader Feedback Score(0)
- Vehicle(s) I drive2024 C8 Z06- 2025 BMW CS- 2022 Porsche 992 GTS
-
Likes:183
-
Liked:901 Times in 573 Posts
Its good to see this in times of economic demise... kudos to you and your team.
Senior Member
Quote:
+1 I was thinking the exact same thing ... Originally Posted by Vic55
Its good to see this in times of economic demise... kudos to you and your team.
Super Member
I luv it, when are you going with the IPO. I say ticker 360 

MB World Stories
The Best of Mercedes & AMG
ExploreSuper Member
Quote:
Same thing I was thinking. Originally Posted by lexaltezza
VERY nice setup. Looks great. Business must be good! The offices look great.
MBWorld Fanatic!
I think a salt water aquarium would look great in there Jordan.
Junior Member
WOW. profit margins must be huge in wheels!! NICE work !
MBWorld Fanatic!
bigben320e
MBWorld Fanatic!
close
Nice digs..I vote for the fish tank as well.
Thanks alot guys! Glad you likey
It's a great place to work - and we're all thankful that during these times we can keep progressing. It's def. not easy! We're really trying to set up for a huge 2009 - new wheels, new services, and new systems so the new facility had to be done.
And for those who commented on the profit margin, it's not as high as you would expect with our wheels, as they cost alot to make, but good quality and customer service go a long way : )
It's a great place to work - and we're all thankful that during these times we can keep progressing. It's def. not easy! We're really trying to set up for a huge 2009 - new wheels, new services, and new systems so the new facility had to be done.
And for those who commented on the profit margin, it's not as high as you would expect with our wheels, as they cost alot to make, but good quality and customer service go a long way : )



