S-Class (W222) 2014-2020

Production & Delivery Dates

Thread Tools
 
Search this Thread
 
Rate Thread
 
Old 11-20-2013, 11:28 PM
  #51  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by gotwire
Was going to get a Dec build S63 but could not configure because H10 carbon trim is on back order. Wouldn't allow a late Jan build either.
replied to your comment on another thread. had the same experience but got lucky a couple weeks ago and now have a build completion of 12/10 - fingers crossed. i pray nothing changes between now and december...

see if you can pester your dealer every week or so and have them try making the change to H10. it worked for me.
Old 11-28-2013, 08:21 AM
  #52  
Member
 
lsdreem's Avatar
 
Join Date: Apr 2011
Posts: 183
Likes: 0
Received 8 Likes on 8 Posts
UNIMOG
Originally Posted by Kratos-TM
Wow....that's a drastic change...

My S63 is on the same boat probably, its on the Onyx Ace. Arrival mid Dec.
Old 11-29-2013, 06:49 PM
  #53  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Well I've finally hit the "red" zone, meaning my order is locked in the system and can't be changed. The ball is beginning to role....
Old 11-30-2013, 12:13 PM
  #54  
MBWorld Fanatic!
 
Diesel Benz's Avatar
 
Join Date: Dec 2006
Location: Europe
Posts: 6,365
Received 294 Likes on 246 Posts
223.168 & 213.012 & 906.633 & 214.005
Originally Posted by Kratos-TM
Well I've finally hit the "red" zone, meaning my order is locked in the system and can't be changed. The ball is beginning to role....
How long is it then from this red zone date to the actual build date? I think you mentioned the build date somewhere but I could not find it. Or is the build date still unknown?
Old 11-30-2013, 12:58 PM
  #55  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by Diesel Benz
How long is it then from this red zone date to the actual build date? I think you mentioned the build date somewhere but I could not find it. Or is the build date still unknown?

Build date is January 1st (on paper), but could be built anytime up to that point. I hit the red zone November 15th. So it looks like the red zone is a month and a half from build date.
Old 11-30-2013, 02:08 PM
  #56  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Build date is January 1st (on paper), but could be built anytime up to that point. I hit the red zone November 15th. So it looks like the red zone is a month and a half from build date.
I believe your dealer can give you a more accurate production date now that you're in the "red", as that means the build has been pulled for production. If I had to guess, I would say you would see your car sooner than you imagined, which is obviously great news.
Old 12-01-2013, 08:12 PM
  #57  
Newbie
 
stanzione88's Avatar
 
Join Date: Oct 2013
Posts: 4
Likes: 0
Received 0 Likes on 0 Posts
2012 mercedes s550
Got good news from mercedes benz of miami, arrival date of my s63 is dec 5th ( to the port ) and about a week or so to take delivery. I keep you all posted
Old 12-01-2013, 08:47 PM
  #58  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by oswiff
I believe your dealer can give you a more accurate production date now that you're in the "red", as that means the build has been pulled for production. If I had to guess, I would say you would see your car sooner than you imagined, which is obviously great news.

Don't mess with my brain. I don't need to feed on any false hope.......LOL.
Not good for my rehabilitation......LOL.
Old 12-02-2013, 04:28 PM
  #59  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Don't mess with my brain. I don't need to feed on any false hope.......LOL.
Not good for my rehabilitation......LOL.
I am not an expert, but I got a glance at my dealer's netstar and I saw the cars that are "red" are all in b3 or b4 status which mean that they are in the production sequence. b4 actually means that it's 2 days from complete. i also saw completion dates in the red so you can ask your dealer what status your car is in and the date associated with it.

Again, this is just what I saw, I cannot say that it's true for everyone but I don't see why MB would make your build red if it weren't going into production.
Old 12-02-2013, 04:30 PM
  #60  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
I am still stuck in yellow in B1 status, which deciphers as 13 days to production...
Old 12-02-2013, 04:47 PM
  #61  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by oswiff
I am not an expert, but I got a glance at my dealer's netstar and I saw the cars that are "red" are all in b3 or b4 status which mean that they are in the production sequence. b4 actually means that it's 2 days from complete. i also saw completion dates in the red so you can ask your dealer what status your car is in and the date associated with it.

Again, this is just what I saw, I cannot say that it's true for everyone but I don't see why MB would make your build red if it weren't going into production.

Hmm.....this makes me wonder if she was referring to the "official red" you saw, or if she meant red in terms of I just can't change my order anymore. ???

So I guess I need to ask if I'm B2, B3, B4?....

Last edited by Kratos-TM; 12-02-2013 at 04:49 PM.
Old 12-02-2013, 06:13 PM
  #62  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Hmm.....this makes me wonder if she was referring to the "official red" you saw, or if she meant red in terms of I just can't change my order anymore. ???

So I guess I need to ask if I'm B2, B3, B4?....
Again, speaking only from what I know... i'm not sure there's a difference. When netstar builds go red, it means that it's further ahead in the production sequence than yellow or blue. At yellow, I can theoretically still make changes.

So as you said, ask your rep if it's red, if so, what's the status (b3,b4,etc) and there should be an actual date under scheduled production, instead of a decade. for instance 12/10/2013 instead of 12-1D-13.
Old 12-02-2013, 06:25 PM
  #63  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by oswiff
Again, speaking only from what I know... i'm not sure there's a difference. When netstar builds go red, it means that it's further ahead in the production sequence than yellow or blue. At yellow, I can theoretically still make changes.

So as you said, ask your rep if it's red, if so, what's the status (b3,b4,etc) and there should be an actual date under scheduled production, instead of a decade. for instance 12/10/2013 instead of 12-1D-13.


Ok, I'll ask my dealer if she can pull a B-status. Thanks oswiff.
Old 12-02-2013, 11:23 PM
  #64  
Member
 
JAN8OR's Avatar
 
Join Date: Jul 2012
Posts: 151
Received 0 Likes on 0 Posts
2015 S 63 AMG 4Matic
I heard from my dealer. They just got their first allocation for 2 S63's, mine being one of them, production in March 2014.

Just saw this vid with the exclusive porcelain and cf.

Old 12-03-2013, 12:10 PM
  #65  
MBWorld Fanatic!
 
Diesel Benz's Avatar
 
Join Date: Dec 2006
Location: Europe
Posts: 6,365
Received 294 Likes on 246 Posts
223.168 & 213.012 & 906.633 & 214.005
Originally Posted by oswiff
I am still stuck in yellow in B1 status, which deciphers as 13 days to production...
If only our dealers were willing (or capable) to provide this level of delivery schedule info...
Old 12-03-2013, 12:41 PM
  #66  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by Diesel Benz
If only our dealers were willing (or capable) to provide this level of delivery schedule info...

Yeah he sounds like he as a great dealer. I'm not so sure mine will be able to answer this question.
Old 12-03-2013, 03:03 PM
  #67  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Just got a response back from my dealer. My order is in "B-1" status. Oswiff, from what I read from your post, that would mean it's in the yellow. If so, then that would mean that there are 2 levels of yellow, a changeable and non-changeable. ??? I'm confused....
Old 12-03-2013, 03:20 PM
  #68  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Found this from an old thread back in 2004. Wonder how accurate it still is....


A4 FINAL SUPPLIER ORDER/SCHEDULED NOT PRODUCED
B0 19 DAYS TO PRODUCTION
B1 13 DAYS TO PRODUCTION
B3 NO CHANGES POSSIBLE
B4 2 DAYS TO COMPLETION
B5 PRODUCTION COMPLETE
B7 AT PORT/READY TO BE SHIPPED
B8 ASSIGNED TO SHIP
C1 SHIP DEPARTED
C2 SHIP NOTIFICATION/ON WQTER
CS SUMITTED TO CUSTOMS
C3 CLEARED CUSTOMS
C4 AT PORT
D1 VPC RECEIVED
D2 SURVEYED AT VPC
D3 POTENTIAL DELAY
D4 READY TO DELIVER
D5 RELEASED TO CARRIER
D9 WHOLESALE/CONSIGNMENT PENDING
F1 WHOLESALED AND INVOICED
I1 RETAIL
Old 12-03-2013, 03:22 PM
  #69  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by oswiff
I am still stuck in yellow in B1 status, which deciphers as 13 days to production...

How long have you been in yellow?
Old 12-03-2013, 04:39 PM
  #70  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Just got a response back from my dealer. My order is in "B-1" status. Oswiff, from what I read from your post, that would mean it's in the yellow. If so, then that would mean that there are 2 levels of yellow, a changeable and non-changeable. ??? I'm confused....
I'm pretty sure there's only blue, yellow, red. If you are in B1, that would put you at 13 days out from whenever you changed. So that's still good news since you were expecting production in January if I remember correctly.

From the netstar I saw, there weren't any builds that were red that still had b1. They were all b3 or b4.
Old 12-03-2013, 04:41 PM
  #71  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
How long have you been in yellow?
About 9-10 days. My build is scheduled for first decade in December with a projected completion on 12/10 so next Tuesday.
Old 12-03-2013, 04:53 PM
  #72  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Just got a response back from my dealer. My order is in "B-1" status. Oswiff, from what I read from your post, that would mean it's in the yellow. If so, then that would mean that there are 2 levels of yellow, a changeable and non-changeable. ??? I'm confused....
Ask your dealer for a screenshot. This is the easiest way to see where you are
Old 12-03-2013, 05:07 PM
  #73  
Super Member
 
Kratos-TM's Avatar
 
Join Date: Jul 2013
Location: McComb MS
Posts: 730
Likes: 0
Received 2 Likes on 2 Posts
2014 Mercedes S550
Originally Posted by oswiff
Ask your dealer for a screenshot. This is the easiest way to see where you are
I asked my dealer twice about where exactly I am and how long I've been in B1. Twice, her response was just "You're currently in B1 status." As if she just skimmed the email and responded the same way twice.

Since I don't have any specific info, let's just say that today was my first day of B1 (worst case), which would mean I would go into production Dec 15th and end production Dec 17th, and would be docking in the states right before January. Is my thinking correct?....
Old 12-03-2013, 05:45 PM
  #74  
Senior Member
 
TomS's Avatar
 
Join Date: Oct 2013
Posts: 316
Likes: 0
Received 8 Likes on 5 Posts
2014 S550, 2011 E350 Cabriolet, Asgard Mothership
Originally Posted by Kratos-TM
I asked my dealer twice about where exactly I am and how long I've been in B1. Twice, her response was just "You're currently in B1 status." As if she just skimmed the email and responded the same way twice.

Since I don't have any specific info, let's just say that today was my first day of B1 (worst case), which would mean I would go into production Dec 15th and end production Dec 17th, and would be docking in the states right before January. Is my thinking correct?....
You must have been impossible during the lead-up to Christmas

You will be driving around in that car of yours while mine is still metal on the way to the factory So, there's a bright side.

Tom
105 days until pickup in Stuttgart.
Old 12-03-2013, 05:50 PM
  #75  
Senior Member
Thread Starter
 
oswiff's Avatar
 
Join Date: Jan 2012
Location: NYC & Long Island
Posts: 336
Likes: 0
Received 1 Like on 1 Post
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
I asked my dealer twice about where exactly I am and how long I've been in B1. Twice, her response was just "You're currently in B1 status." As if she just skimmed the email and responded the same way twice.

Since I don't have any specific info, let's just say that today was my first day of B1 (worst case), which would mean I would go into production Dec 15th and end production Dec 17th, and would be docking in the states right before January. Is my thinking correct?....
Not sure why your dealer is making such a simple task so difficult. It takes 5 minutes to do...and would make a world of difference to the customer

So per your scenario, I would say you would see the car early January, I would say if you were very lucky a day or two before January..

If completion is the 17th, they will look to load it within a few days after that.

For example my g63 was at the dock in Europe last year on February 13th. It didn't leave that port until the 16th. It arrived in the US on the 26th and was at my dealer 2 days later.

However, if you factor in the holidays, i could see it take a few days longer.


You have already rated this thread Rating: Thread Rating: 0 votes,  average.

Quick Reply: Production & Delivery Dates



All times are GMT -4. The time now is 05:10 AM.