Notices
S-Class (W222) 2014-2020

Production & Delivery Dates

Thread Tools
 
Search this Thread
 
Rate Thread
 
Old Nov 20, 2013 | 11:28 PM
  #51  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by gotwire
Was going to get a Dec build S63 but could not configure because H10 carbon trim is on back order. Wouldn't allow a late Jan build either.
replied to your comment on another thread. had the same experience but got lucky a couple weeks ago and now have a build completion of 12/10 - fingers crossed. i pray nothing changes between now and december...

see if you can pester your dealer every week or so and have them try making the change to H10. it worked for me.
Reply
Old Nov 28, 2013 | 08:21 AM
  #52  
lsdreem's Avatar
Member
 
Joined: Apr 2011
Posts: 185
Likes: 8
UNIMOG
Originally Posted by Kratos-TM
Wow....that's a drastic change...

My S63 is on the same boat probably, its on the Onyx Ace. Arrival mid Dec.
Reply
Old Nov 29, 2013 | 06:49 PM
  #53  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Well I've finally hit the "red" zone, meaning my order is locked in the system and can't be changed. The ball is beginning to role....
Reply
Old Nov 30, 2013 | 12:13 PM
  #54  
Diesel Benz's Avatar
MBWorld Fanatic!
15 Year Member
 
Joined: Dec 2006
Posts: 6,499
Likes: 336
From: Europe
223.168 & 213.012 & 906.633 & 214.005
Originally Posted by Kratos-TM
Well I've finally hit the "red" zone, meaning my order is locked in the system and can't be changed. The ball is beginning to role....
How long is it then from this red zone date to the actual build date? I think you mentioned the build date somewhere but I could not find it. Or is the build date still unknown?
Reply
Old Nov 30, 2013 | 12:58 PM
  #55  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by Diesel Benz
How long is it then from this red zone date to the actual build date? I think you mentioned the build date somewhere but I could not find it. Or is the build date still unknown?

Build date is January 1st (on paper), but could be built anytime up to that point. I hit the red zone November 15th. So it looks like the red zone is a month and a half from build date.
Reply
Old Nov 30, 2013 | 02:08 PM
  #56  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Build date is January 1st (on paper), but could be built anytime up to that point. I hit the red zone November 15th. So it looks like the red zone is a month and a half from build date.
I believe your dealer can give you a more accurate production date now that you're in the "red", as that means the build has been pulled for production. If I had to guess, I would say you would see your car sooner than you imagined, which is obviously great news.
Reply
Old Dec 1, 2013 | 08:12 PM
  #57  
stanzione88's Avatar
Newbie
 
Joined: Oct 2013
Posts: 4
Likes: 0
2012 mercedes s550
Got good news from mercedes benz of miami, arrival date of my s63 is dec 5th ( to the port ) and about a week or so to take delivery. I keep you all posted
Reply
Old Dec 1, 2013 | 08:47 PM
  #58  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by oswiff
I believe your dealer can give you a more accurate production date now that you're in the "red", as that means the build has been pulled for production. If I had to guess, I would say you would see your car sooner than you imagined, which is obviously great news.

Don't mess with my brain. I don't need to feed on any false hope.......LOL.
Not good for my rehabilitation......LOL.
Reply
MB World Stories

The Best of Mercedes & AMG

story-0

Six Gift Ideas Your AMG Loving Dad or Grad Will Cherish

 
story-1

7 Craziest Things AMG Gas Ever Built

 Verdad Gallardo
story-2

New Electric Mercedes-AMG GT 4-Door Coupe Unveiled: 10 Things You Need to Know

 Verdad Gallardo
story-3

6 Mercedes Models That Did NOT Age Well (But Are Somehow Still Cool)

 Verdad Gallardo
story-4

Manual Mercedes? 6 Times Sindelfingen Let Drivers Have All The Fun

 Verdad Gallardo
story-5

Mercedes SLR McLaren 722 S Is Extremely Rare Example Modified by McLaren

 Verdad Gallardo
story-6

8 Classic Boxy Mercedes Designs That Have Aged Like Fine Wine

 Verdad Gallardo
story-7

Flawlessly Restored Mercedes 190E Evo II Heads to Auction

 Verdad Gallardo
story-8

Electric Mercedes C-Class Unveiled: 11 Things You Need to Know

 Verdad Gallardo
story-9

Mercedes EQS Gets A Major Update: Everything You Need to Know

 Verdad Gallardo
Old Dec 2, 2013 | 04:28 PM
  #59  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Don't mess with my brain. I don't need to feed on any false hope.......LOL.
Not good for my rehabilitation......LOL.
I am not an expert, but I got a glance at my dealer's netstar and I saw the cars that are "red" are all in b3 or b4 status which mean that they are in the production sequence. b4 actually means that it's 2 days from complete. i also saw completion dates in the red so you can ask your dealer what status your car is in and the date associated with it.

Again, this is just what I saw, I cannot say that it's true for everyone but I don't see why MB would make your build red if it weren't going into production.
Reply
Old Dec 2, 2013 | 04:30 PM
  #60  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
I am still stuck in yellow in B1 status, which deciphers as 13 days to production...
Reply
Old Dec 2, 2013 | 04:47 PM
  #61  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by oswiff
I am not an expert, but I got a glance at my dealer's netstar and I saw the cars that are "red" are all in b3 or b4 status which mean that they are in the production sequence. b4 actually means that it's 2 days from complete. i also saw completion dates in the red so you can ask your dealer what status your car is in and the date associated with it.

Again, this is just what I saw, I cannot say that it's true for everyone but I don't see why MB would make your build red if it weren't going into production.

Hmm.....this makes me wonder if she was referring to the "official red" you saw, or if she meant red in terms of I just can't change my order anymore. ???

So I guess I need to ask if I'm B2, B3, B4?....

Last edited by Kratos-TM; Dec 2, 2013 at 04:49 PM.
Reply
Old Dec 2, 2013 | 06:13 PM
  #62  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Hmm.....this makes me wonder if she was referring to the "official red" you saw, or if she meant red in terms of I just can't change my order anymore. ???

So I guess I need to ask if I'm B2, B3, B4?....
Again, speaking only from what I know... i'm not sure there's a difference. When netstar builds go red, it means that it's further ahead in the production sequence than yellow or blue. At yellow, I can theoretically still make changes.

So as you said, ask your rep if it's red, if so, what's the status (b3,b4,etc) and there should be an actual date under scheduled production, instead of a decade. for instance 12/10/2013 instead of 12-1D-13.
Reply
Old Dec 2, 2013 | 06:25 PM
  #63  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by oswiff
Again, speaking only from what I know... i'm not sure there's a difference. When netstar builds go red, it means that it's further ahead in the production sequence than yellow or blue. At yellow, I can theoretically still make changes.

So as you said, ask your rep if it's red, if so, what's the status (b3,b4,etc) and there should be an actual date under scheduled production, instead of a decade. for instance 12/10/2013 instead of 12-1D-13.


Ok, I'll ask my dealer if she can pull a B-status. Thanks oswiff.
Reply
Old Dec 2, 2013 | 11:23 PM
  #64  
JAN8OR's Avatar
Member
10 Year Member
Photogenic
Photoriffic
Shutterbug
 
Joined: Jul 2012
Posts: 154
Likes: 0
2015 S 63 AMG 4Matic
I heard from my dealer. They just got their first allocation for 2 S63's, mine being one of them, production in March 2014.

Just saw this vid with the exclusive porcelain and cf.

Reply
Old Dec 3, 2013 | 12:10 PM
  #65  
Diesel Benz's Avatar
MBWorld Fanatic!
15 Year Member
 
Joined: Dec 2006
Posts: 6,499
Likes: 336
From: Europe
223.168 & 213.012 & 906.633 & 214.005
Originally Posted by oswiff
I am still stuck in yellow in B1 status, which deciphers as 13 days to production...
If only our dealers were willing (or capable) to provide this level of delivery schedule info...
Reply
Old Dec 3, 2013 | 12:41 PM
  #66  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by Diesel Benz
If only our dealers were willing (or capable) to provide this level of delivery schedule info...

Yeah he sounds like he as a great dealer. I'm not so sure mine will be able to answer this question.
Reply
Old Dec 3, 2013 | 03:03 PM
  #67  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Just got a response back from my dealer. My order is in "B-1" status. Oswiff, from what I read from your post, that would mean it's in the yellow. If so, then that would mean that there are 2 levels of yellow, a changeable and non-changeable. ??? I'm confused....
Reply
Old Dec 3, 2013 | 03:20 PM
  #68  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Found this from an old thread back in 2004. Wonder how accurate it still is....


A4 FINAL SUPPLIER ORDER/SCHEDULED NOT PRODUCED
B0 19 DAYS TO PRODUCTION
B1 13 DAYS TO PRODUCTION
B3 NO CHANGES POSSIBLE
B4 2 DAYS TO COMPLETION
B5 PRODUCTION COMPLETE
B7 AT PORT/READY TO BE SHIPPED
B8 ASSIGNED TO SHIP
C1 SHIP DEPARTED
C2 SHIP NOTIFICATION/ON WQTER
CS SUMITTED TO CUSTOMS
C3 CLEARED CUSTOMS
C4 AT PORT
D1 VPC RECEIVED
D2 SURVEYED AT VPC
D3 POTENTIAL DELAY
D4 READY TO DELIVER
D5 RELEASED TO CARRIER
D9 WHOLESALE/CONSIGNMENT PENDING
F1 WHOLESALED AND INVOICED
I1 RETAIL
Reply
Old Dec 3, 2013 | 03:22 PM
  #69  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by oswiff
I am still stuck in yellow in B1 status, which deciphers as 13 days to production...

How long have you been in yellow?
Reply
Old Dec 3, 2013 | 04:39 PM
  #70  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Just got a response back from my dealer. My order is in "B-1" status. Oswiff, from what I read from your post, that would mean it's in the yellow. If so, then that would mean that there are 2 levels of yellow, a changeable and non-changeable. ??? I'm confused....
I'm pretty sure there's only blue, yellow, red. If you are in B1, that would put you at 13 days out from whenever you changed. So that's still good news since you were expecting production in January if I remember correctly.

From the netstar I saw, there weren't any builds that were red that still had b1. They were all b3 or b4.
Reply
Old Dec 3, 2013 | 04:41 PM
  #71  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
How long have you been in yellow?
About 9-10 days. My build is scheduled for first decade in December with a projected completion on 12/10 so next Tuesday.
Reply
Old Dec 3, 2013 | 04:53 PM
  #72  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
Just got a response back from my dealer. My order is in "B-1" status. Oswiff, from what I read from your post, that would mean it's in the yellow. If so, then that would mean that there are 2 levels of yellow, a changeable and non-changeable. ??? I'm confused....
Ask your dealer for a screenshot. This is the easiest way to see where you are
Reply
Old Dec 3, 2013 | 05:07 PM
  #73  
Kratos-TM's Avatar
Super Member
 
Joined: Jul 2013
Posts: 730
Likes: 2
From: McComb MS
2014 Mercedes S550
Originally Posted by oswiff
Ask your dealer for a screenshot. This is the easiest way to see where you are
I asked my dealer twice about where exactly I am and how long I've been in B1. Twice, her response was just "You're currently in B1 status." As if she just skimmed the email and responded the same way twice.

Since I don't have any specific info, let's just say that today was my first day of B1 (worst case), which would mean I would go into production Dec 15th and end production Dec 17th, and would be docking in the states right before January. Is my thinking correct?....
Reply
Old Dec 3, 2013 | 05:45 PM
  #74  
TomS's Avatar
Senior Member
10 Year Member
 
Joined: Oct 2013
Posts: 318
Likes: 12
2014 S550, 2011 E350 Cabriolet, Asgard Mothership
Originally Posted by Kratos-TM
I asked my dealer twice about where exactly I am and how long I've been in B1. Twice, her response was just "You're currently in B1 status." As if she just skimmed the email and responded the same way twice.

Since I don't have any specific info, let's just say that today was my first day of B1 (worst case), which would mean I would go into production Dec 15th and end production Dec 17th, and would be docking in the states right before January. Is my thinking correct?....
You must have been impossible during the lead-up to Christmas

You will be driving around in that car of yours while mine is still metal on the way to the factory So, there's a bright side.

Tom
105 days until pickup in Stuttgart.
Reply
Old Dec 3, 2013 | 05:50 PM
  #75  
oswiff's Avatar
Thread Starter
Senior Member
 
Joined: Jan 2012
Posts: 336
Likes: 1
From: NYC & Long Island
'14.5 RR LWB, '14 s63, '14 Ford Raptor Screw, '13 G63
Originally Posted by Kratos-TM
I asked my dealer twice about where exactly I am and how long I've been in B1. Twice, her response was just "You're currently in B1 status." As if she just skimmed the email and responded the same way twice.

Since I don't have any specific info, let's just say that today was my first day of B1 (worst case), which would mean I would go into production Dec 15th and end production Dec 17th, and would be docking in the states right before January. Is my thinking correct?....
Not sure why your dealer is making such a simple task so difficult. It takes 5 minutes to do...and would make a world of difference to the customer

So per your scenario, I would say you would see the car early January, I would say if you were very lucky a day or two before January..

If completion is the 17th, they will look to load it within a few days after that.

For example my g63 was at the dock in Europe last year on February 13th. It didn't leave that port until the 16th. It arrived in the US on the 26th and was at my dealer 2 days later.

However, if you factor in the holidays, i could see it take a few days longer.
Reply


You have already rated this thread Rating: Thread Rating: 0 votes,  average.


All times are GMT -4. The time now is 12:10 PM.

story-0
Six Gift Ideas Your AMG Loving Dad or Grad Will Cherish

Slideshow: Six gift ideas your AMG loving dad or grad will cherish.

By | 2026-06-03 17:26:18


VIEW MORE
story-1
7 Craziest Things AMG Gas Ever Built

Slideshow: Sometimes AMG builds fast sedans. Other times, it builds twin-turbo V12 land missiles and six-wheeled off-road monsters.

By Verdad Gallardo | 2026-05-26 17:59:58


VIEW MORE
story-2
New Electric Mercedes-AMG GT 4-Door Coupe Unveiled: 10 Things You Need to Know

Slideshow: Mercedes-AMG's new electric GT 4-Door Coupe trades combustion for software, synthetic noise, and more than 1,100 horsepower.

By Verdad Gallardo | 2026-05-20 20:08:15


VIEW MORE
story-3
6 Mercedes Models That Did NOT Age Well (But Are Somehow Still Cool)

Slideshow: Not every Mercedes design becomes timeless, some feel stuck in the era they came from.

By Verdad Gallardo | 2026-05-12 18:09:07


VIEW MORE
story-4
Manual Mercedes? 6 Times Sindelfingen Let Drivers Have All The Fun

Slideshow: Yes, Mercedes built manual cars, and some of them are far more interesting than you'd expect.

By Verdad Gallardo | 2026-05-02 12:36:58


VIEW MORE
story-5
Mercedes SLR McLaren 722 S Is Extremely Rare Example Modified by McLaren

Slideshow: A one-of-one U.S.-spec Mercedes-Benz SLR McLaren Roadster became even rarer after a factory-backed transformation at McLaren's headquarters.

By Verdad Gallardo | 2026-04-29 11:19:28


VIEW MORE
story-6
8 Classic Boxy Mercedes Designs That Have Aged Like Fine Wine

Slideshow: Before curves took over, Mercedes mastered the art of the straight line, and some of those shapes still look right today.

By Verdad Gallardo | 2026-04-25 12:05:49


VIEW MORE
story-7
Flawlessly Restored Mercedes 190E Evo II Heads to Auction

Slideshow: The 190E Evolution II shows how a homologation necessity became a six-figure collector icon.

By Verdad Gallardo | 2026-04-22 17:53:47


VIEW MORE
story-8
Electric Mercedes C-Class Unveiled: 11 Things You Need to Know

Slideshow: Mercedes is turning one of its core nameplates electric, and the details show just how serious this shift is.

By Verdad Gallardo | 2026-04-21 13:58:06


VIEW MORE
story-9
Mercedes EQS Gets A Major Update: Everything You Need to Know

Slideshow: Faster charging, longer range, and a controversial steer-by-wire system define the latest evolution of Mercedes-Benz EQS.

By Verdad Gallardo | 2026-04-15 10:35:34


VIEW MORE