Latest Progress Pics
These are the latest progress pics I got from FD today for your reference and the mods listed under my sig is what will be installed.
Please submit your vote on the final outcome.
Last edited by AMGSC; Jun 13, 2009 at 05:00 PM.
1. Under 'performance': this is what you already have installed?
2. Under 'Q2-09 by Fedor Dezyn': these are the mods yet to be installed?
3. What performance modifications under 'Performance' are going to be used along with the FD-installed power-adders? Can we assume you are keeping the Kleemann supercharger for the time being?
4. What is the goal for crank horsepower upon successful installation and tuning? Give an 'estimate'.
5. You posted in the W211 AMG forum: "....I guaranteee the MB dragtimes record will be shattered by this June. I'm thinking sub 10.3 on SC and high 9's with TT....". Are these expectations still applicable?
6. It seems to me that FD will either get the job done or not get it done regardless of a thread on MBWorld.
1. Under 'performance': this is what you already have installed? yes
2. Under 'Q2-09 by Fedor Dezyn': these are the mods yet to be installed? yes
3. What performance modifications under 'Performance' are going to be used along with the FD-installed power-adders? Can we assume you are keeping the Kleemann supercharger for the time being? Everything including Kleemann SC but smaller pulley raising boost to 1 bar.
4. What is the goal for crank horsepower upon successful installation and tuning? Give an 'estimate'. 500-550rwhp depending on boost levels balanced with drivability.
5. You posted in the W211 AMG forum: "....I guaranteee the MB dragtimes record will be shattered by this June. I'm thinking sub 10.3 on SC and high 9's with TT....". Are these expectations still applicable? Yes, but at higher boost than 1 bar and weight reductions much like Ahmad (BlackBenzz)
6. It seems to me that FD will either get the job done or not get it done regardless of a thread on MBWorld.Agreed. But based on what you see in the pics is it possible to complete the items on the Q2 list (except for Zex) in 10 work days?
Last edited by AMGSC; Jun 13, 2009 at 06:11 PM.

Then again, if your vehicle is the only priority for FD in the next 10 days, anything is possible.
I'm going to say 'not possible' in 10 days based solely on the fact that tuning this motor is going to be tough. You of all people are intimately aware of the issues that can arise with tuning.
Lets say that the hardware is installed without a hitch (valves, etc., etc.) and that tolerances, clearances, and compression are acceptable. Let us also assume that cranking of the motor and test driving goes without incident (i.e. no metal shards in the sump, etc.).
You are installing unique modifications (in unique permutations and combinations) on an M113 that I have never heard about.
[Disclaimer: that doesn't mean nobody has ever done at least some of them before]
BTW, you ought to include another option in your poll (in between the last two). You are basically saying that if it is not accomplished in 10 working days + 1 week, there is the possibility of a lawsuit?
How about the option of voting for:
"Not Completed - will take as long as is necessary to make it work safely"
After all, we all want to see this work for you.

Then again, if your vehicle is the only priority for FD in the next 10 days, anything is possible.
I'm going to say 'not possible' in 10 days based solely on the fact that tuning this motor is going to be tough. You of all people are intimately aware of the issues that can arise with tuning.
Lets say that the hardware is installed without a hitch (valves, etc., etc.) and that tolerances, clearances, and compression are acceptable. Let us also assume that cranking of the motor and test driving goes without incident (i.e. no metal shards in the sump, etc.).
You are installing unique modifications (in unique permutations and combinations) on an M113 that I have never heard about.
[Disclaimer: that doesn't mean nobody has ever done at least some of them before]
BTW, you ought to include another option in your poll (in between the last two). You are basically saying that if it is not accomplished in 10 working days + 1 week, there is the possibility of a lawsuit?
How about the option of voting for:
"Not Completed - will take as long as is necessary to make it work safely"
After all, we all want to see this work for you.
Bottom Line: If you can't complete a project in more than double the time you originally committed to then:
A) You have financial capital issues.
B) You have capability issues.
C) You have integrity issues.
D) All of the above.
E) You have ISSUES.
Last edited by AMGSC; Jun 13, 2009 at 07:52 PM.
Trending Topics
The Best of Mercedes & AMG

PM me if you know something about FD that I don't.
Think I'm gonna call the machine shop guy and ask him what's the delay. I hope he doesn't say he hasn't been paid yet so no work has begun.
That would really suck. I dread thinking about what the Bernie Madoff investors went through.
Off course...if I start getting pics and eyewitness the rapid progress then I will be less anxious. The reasons for the recent delays in order of most recent were:
1) 1 bolt was missing.
2) Rod bearing color code mismatch.
3) Two valves were missing.
4) Machine Shop guy was sick.
5) He was sick.
6) Piston tolerances needed reinspection by Ross.
7) Pistons were errroneously made to stock compression.
There are more but I'd have to dig up my emails, voicemails or try recalling from memory. I'm seriously running out of patience. I've already paid $15K of the $19K for this build and I am fukin nervous as hell based on some rumors I'm hearing. If I'm being played then there's going to be hell to pay for.
Last edited by AMGSC; Jun 14, 2009 at 12:58 AM.

PM me if you know something about FD that I don't.
I was in the same position as you currently are. My engine build kept getting delayed by months and Victor said it was due to some employee lay-offs in the shop which made them over booked with work and pushed my build off to the side. Victor gave me his engine builder's contact info and I contacted him myself. Victor and I have always stayed in contact, but it was great to speak with the engine builder himself as I was able to confirm the situation and get detailed information about my engine build.
The way I approach these builds is that you should expect some delays at each level of progress.
1) 1 bolt was missing.
2) Rod bearing color code mismatch.
3) Two valves were missing.
4) Machine Shop guy was sick.
5) He was sick.
6) Piston tolerances needed reinspection by Ross.
7) Pistons were errroneously made to stock compression.

Just stay positive, focused on the end result, and most important, keep your patience!
Think I'm gonna call the machine shop guy and ask him what's the delay. I hope he doesn't say he hasn't been paid yet so no work has begun.
That would really suck. I dread thinking about what the Bernie Madoff investors went through.
Off course...if I start getting pics and eyewitness the rapid progress then I will be less anxious. The reasons for the recent delays in order of most recent were:
1) 1 bolt was missing.
2) Rod bearing color code mismatch.
3) Two valves were missing.
4) Machine Shop guy was sick.
5) He was sick.
6) Piston tolerances needed reinspection by Ross.
7) Pistons were errroneously made to stock compression.
There are more but I'd have to dig up my emails, voicemails or try recalling from memory. I'm seriously running out of patience. I've already paid $15K of the $19K for this build and I am fukin nervous as hell based on some rumors I'm hearing. If I'm being played then there's going to be hell to pay for.
Honestly I dont think it gets completed by june 30th. Its not fair to you if it doesnt. I'm on your side 100% You list of reasons is valid in my eyes. Just like all the other members, we want to see this car finished. At this point keep your paper trail in order in case it comes down to a court case.
GL on the finish-should be a beast when it gets there-deadlines suck-once they come and go-its a whole new feeling-but when it starts out-seems a mile away!
I know you have been waiting for over 6 months and I can't imaging how frustrated you are; but... you need to handle the situation towards your benefit. At the end of the day, you want a complete beast, get what you pay for and avoid dealing with lawsuits and such.
Give them double the time frame you were offered... say until July 15th (or that following Friday July 17th). Not one minute after that. You know better they won't have the car ready by the end of the month. You know you don't want to waste your time dealing with lawyers. You want your car, running properly and the way you envisioned it...
You know also your money is long gone and you are at the mercy of the tuner. You are in a delicate situation where the only proactive measurement will be to work things out for the best of your interests. Tell them to prepare a detailed time frame of activities and to update you every 2-3 days. You need to get details and follow up on each step. Otherwise, you are going to be here July 1st more frustrated than now.
On the same token, this is what happens when dealing with small upcoming tuners. There isn't cash anywhere these days. You will see companies being sold, split or simply dissapear during these times. Some people complain about companies like Renntech for example. What do you think happens when you bring your car to the big guys, $30K and a wishlist? You always get what you pay for...
Even if they did by some miracle manage to get it all completed by the end of the month, it STILL would have taken them waaay too long to accomplish this. There is no way they should be given more time. A deduction of $100 per day is very fair. It will be interesting to see how much quicker things start moving along once their wallets are hit.
AMGSC, you're a very patient man and I think that's been exploited. You have 6+ months of depreciation on a car that's been sitting in pieces. It's definitely time to put your foot down.
The biggest issue I have with deducting $100 a day after June 30th is you only leave yourself 40 days after June 30th to "punish" them (since you said you'd already paid 15K out of 19K total). After that they can take their sweet time until legal matters get involved...
Tread softly in this area, but defintaely don't be pushed around...
I would definately sit down and weigh out all the options by yourself on paper and then make a final decision based on your own gut feeling and opinions.
Good Luck with everything, we all hope for a positive turn out I'm sure.