Full Weistec build and much more on 2009 C63
Current status of things; Had to replumb the nitrous system for better flow. Blower ready to go back on now. Killer Chiller should be at shop within the next week for install. Cage is finishing up and then will b dropped in.
The Best of Mercedes & AMG
Last edited by redragn; Aug 12, 2016 at 08:58 PM.
Sorry for the long delay, but there were lots of issues with getting the correct fittings to hold all the pressure in the cooling lines. Multiple times the wrong fittings were sent. But that finally got sorted out. The plumbing is done for the nitrous system. They built a floor for the ice tank and bottle which turned out amazing and will keep the trunk clean from above. There is a pic of the CNCd brackets to hold the nitrous controller. Face-lift lights are in.
Obviously wasn't able to go to the Wannagofast event as the car was still in pieces. Definitely nxt year tho. Looks like it'll b a short driving season this year once it's done.
We r hoping dyno time very soon. Videos to follow.
After dyno is completed, the exterior elements will be added.