Full Weistec build and much more on 2009 C63
When it's complete you should have a christening like a new ship being placed in to service.
The Best of Mercedes & AMG
Whenever it's done I'll be driving up to pick it up at the shop and can't wait for the drive back home! I'll keep updates as things progress and will give a heads up when that wknd arrives. The dyno runs will b before the final pickup but I will prob go up myself to not miss that. In the end it should b one of the fastest if not the fastest C63 out there. I'm hoping to put it on the 1/8, 1/4, 1/2 and mile runs around this year and see what it can do.
Just about done with some more fab, mainly for the nitrous setup. Wizards of NOS.
I'll b going to stop in a week and will have more pics n updates.
Coming out really awesome tho. Shop is making some unique pieces!
Last edited by redragn; May 12, 2016 at 11:00 AM.
Its coming along!! Lots of lines, switches and wiring need to be run. KC ice box. Then CF Gruppe M intake will be installed. NOS purge through the CF hood vents. Remaining exhaust system needs to be bolted together with the cutout. Front and rear lights. Cage to be put in. And finally the widebody.
Oil cooler in front, trans cooler behind. Took 11.5 qts of oil.




. I should take the 20 min drive down there and take a peak at your car.






