GLE Class (V167) Produced 2020 to present

Production delays/ timeline

Thread Tools
 
Search this Thread
 
Rate Thread
 
Old 06-04-2019, 02:26 PM
  #426  
Senior Member
 
bigpern23's Avatar
 
Join Date: May 2019
Location: New England
Posts: 442
Received 125 Likes on 72 Posts
2020 GLE 450 AMG exterior
Originally Posted by tery
Don’t feel bad guys my VIN ends with 20000, it’s sitting somewhere deeper or maybe a flat spot on the tires already.
Seriously, I would feel better about it if they kept them in a covered airplane hangar or something. Hopefully they're at least washing them regularly (I doubt it).
Old 06-04-2019, 02:28 PM
  #427  
Newbie
 
attardtony's Avatar
 
Join Date: Nov 2015
Posts: 12
Received 2 Likes on 2 Posts
Mercedes GLe
production delay/time line

Mine have been parked some where in Alabama since the 25th of March, who knows in which parking and what condition.

Last edited by attardtony; 06-04-2019 at 02:34 PM. Reason: mistake
Old 06-04-2019, 02:32 PM
  #428  
MBWorld Fanatic!
 
tery's Avatar
 
Join Date: Mar 2002
Location: Vancouver
Posts: 1,184
Received 79 Likes on 53 Posts
CLK320
And who knows what’s going to happen it might show up missing some options.
Old 06-04-2019, 03:53 PM
  #429  
MBWorld Fanatic!
 
GregW / Oregon's Avatar
 
Join Date: Jul 2003
Location: Lake Oswego, OR
Posts: 6,607
Received 1,186 Likes on 853 Posts
2020 GLE 450; 2023 BMW M2 Coupe
Production delays

Originally Posted by Bubba3
I check my status again today and it appears that progress is being made. The production date is still 6/10/2019 but the status has changed to B4 X-2 PROD. It shows that a VIN was assigned on 5/31 and that production was started on 5/31.

Based on what has been reported by others here and in the V167 thread it seems like things are starting to move along in a more normal fashion. Hopefully, I won't have to go through GregW's experience in B4 status.
I hope so, too!
Originally Posted by Sharon Bishop
Good Luck!! Mine has had a VIN since March, and still no progress.
[QUOTE=bigpern23;7771006He asked if I'd be interested in ordering that one and I told him about the one I already ordered from the other dealer in my area. He went into NetStar to check on it and he said I'll have one of the first 450s delivered to New England. He also said that if I still want to stay with the 450 after all this delay, don't do anything that would cause me to lose this car. So that's encouraging, anyway. I figure it should at least be done in the next two months or he would have tried to get me to take the one he has coming in.[/QUOTE]
Originally Posted by rm50
On 4/29 my SA informed me that my fully loaded GLE 450 with E-ABC had moved to production status. As of yesterday I asked for the Vin # and the production code. My Vin # is in the low 48,000 and my production code is B4A. I understand what B4 means but I don't know what the A stands for. I assume my car has been produced and it is setting parked somewhere in Tuscaloosa, exposed to heat and humidity and bird droppings. Not exactly how I think a new car should be treated.
Originally Posted by Lee Kogel
Cancelled mine today after a further delay when it should have arrived 7th May.
I'm not paying a large sum of money for a car that’s sitting on a parking lot for 2 months. Best off luck guys 🤙🏻 Kog out!!!
Originally Posted by tery
Don’t feel bad guys my VIN ends with 20000, it’s sitting somewhere deeper or maybe a flat spot on the tires already.
Originally Posted by bigpern23
Seriously, I would feel better about it if they kept them in a covered airplane hangar or something. Hopefully they're at least washing them regularly (I doubt it).
Originally Posted by attardtony
Mine have been parked some where in Alabama since the 25th of March, who knows in which parking and what condition.
Don't assume that just because you car has a VIN and "production started," that is it mostly done setting in a field. I believe production "starts" when a pre-made & painted body shell in the ASRS is assigned a VIN. It may in fact not move down the line until they are sure they have all the correct and good parts for it. The ones stored were obviously earlier in the production process before they found out about certain out of spec parts. Take solace in the fact mine was "in production" for 6 weeks and was perfect when it arrived. Hopefully, things are starting to move but you may still be in B4 for a while before moving to D, F and finally S status.
Old 06-04-2019, 04:32 PM
  #430  
Member
 
beth22's Avatar
 
Join Date: Dec 2018
Posts: 189
Received 12 Likes on 9 Posts
2018 GLS 450, 2018 GLE 4matic
Cars in Parking Lots

Is there any definitive way to know if an ordered car is sitting in a field for weeks/months?
Old 06-04-2019, 05:21 PM
  #431  
Junior Member
 
Sharon Bishop's Avatar
 
Join Date: May 2019
Location: Michigan
Posts: 35
Received 5 Likes on 5 Posts
2019 Cabriolet AMG S 63
Mine ends in 45000, not a good sign that those ending in 20000 are not delivered!
Old 06-04-2019, 05:41 PM
  #432  
Junior Member
 
bob01's Avatar
 
Join Date: Apr 2019
Location: Toronto, Canada
Posts: 68
Received 24 Likes on 13 Posts
2009, 2012 ml, 2016 gle350d, 2020 gle450
LOL - my VIN ends 2074x, I've given up looking for it - there's no credible information / communication so it'll get here whenever it gets here.
If it arrives in good condition (no sunburn), no options missing and I haven't already ordered something else then I'll be glad to have it - if not, oh well.

Last edited by bob01; 06-04-2019 at 05:56 PM.
Old 06-04-2019, 05:43 PM
  #433  
MBWorld Fanatic!
 
tery's Avatar
 
Join Date: Mar 2002
Location: Vancouver
Posts: 1,184
Received 79 Likes on 53 Posts
CLK320
I went from angry to disappointment and now I look at it as an investment, it is what it is.
I believe there are no other SUV can match the tech and value of the new GLE can offer. And we all put in the work and emotion to wait for it might as well see what would happen.
Old 06-04-2019, 08:48 PM
  #434  
Junior Member
 
rm50's Avatar
 
Join Date: Dec 2018
Location: Las Vegas
Posts: 17
Received 3 Likes on 3 Posts
GLE450 Ordered 12/11 Build date Mar 3rd decade, Mar 1st decade, 4/27 now 5/3
MBUSA has a new CEO and the former CEO is leaving the company. I don't know if this has anything to do with the production problems that is affecting our ordered GLE 450's. I hope that his #1 priority is to fix our problem. I am sure that 2nd Qtr earnings will be down and I hope it affects their stock price as added motivation to fix this. Here is a link. https://www.autonews.com/executives/...zs-new-us-boss
Old 06-05-2019, 02:45 PM
  #435  
Junior Member
 
J2brian703's Avatar
 
Join Date: Jan 2014
Location: San Jose, CA
Posts: 59
Likes: 0
Received 10 Likes on 5 Posts
BMW 435i GC
Originally Posted by J2brian703
What’s the difference between B4-X-2 and B4-X-10? Mine shows X-10.
Finally, the production has finished. It finished about a week early.
What is RLS to Carrier mean? Does that mean it is already shipped or is it getting ready to shipped?
Does anyone know? I live in San Francisco. Does anyone know how long it will take to arrive here?

The following users liked this post:
venkyszone (06-05-2019)
Old 06-05-2019, 03:24 PM
  #436  
Member
 
Rocketman's Avatar
 
Join Date: Sep 2007
Posts: 135
Likes: 0
Received 18 Likes on 9 Posts
SL 500
RLS = Released to carrier.
Old 06-05-2019, 04:19 PM
  #437  
Senior Member
 
bigpern23's Avatar
 
Join Date: May 2019
Location: New England
Posts: 442
Received 125 Likes on 72 Posts
2020 GLE 450 AMG exterior
Originally Posted by J2brian703
Finally, the production has finished. It finished about a week early.
What is RLS to Carrier mean? Does that mean it is already shipped or is it getting ready to shipped?
Does anyone know? I live in San Francisco. Does anyone know how long it will take to arrive here?

Interesting that you have a similar build to mine - third row, AMG exterior - and yours was planned for production in the third decade of May and it’s already complete.

My 450 was planned for production the first decade of March and is still hung up in B4. Makes me wonder if it’s an issue with the engine that’s holding up all these 450s.
Old 06-05-2019, 04:32 PM
  #438  
MBWorld Fanatic!
 
GregW / Oregon's Avatar
 
Join Date: Jul 2003
Location: Lake Oswego, OR
Posts: 6,607
Received 1,186 Likes on 853 Posts
2020 GLE 450; 2023 BMW M2 Coupe
Production delays continue

Originally Posted by bigpern23
Interesting that you have a similar build to mine - third row, AMG exterior - and yours was planned for production in the third decade of May and it’s already complete.

My 450 was planned for production the first decade of March and is still hung up in B4. Makes me wonder if it’s an issue with the engine that’s holding up all these 450s.
I'm not sure how you could draw that conclusion. We heard one report that there were bad electronics in quite a few builds (https://mbworld.org/forums/gle-class...ml#post7736183). If yours was one of those it may be waiting for retrofit, which is a slower process than new builds.
Old 06-05-2019, 05:06 PM
  #439  
Senior Member
 
bigpern23's Avatar
 
Join Date: May 2019
Location: New England
Posts: 442
Received 125 Likes on 72 Posts
2020 GLE 450 AMG exterior
Originally Posted by GregW / Oregon
I'm not sure how you could draw that conclusion. We heard one report that there were bad electronics in quite a few builds (https://mbworld.org/forums/gle-class...ml#post7736183). If yours was one of those it may be waiting for retrofit, which is a slower process than new builds.
Just wondering out loud. It does seem like there are a lot fewer 450s being released than 350s.
Old 06-05-2019, 05:28 PM
  #440  
Junior Member
 
Bubba3's Avatar
 
Join Date: Apr 2014
Location: Las Vegas
Posts: 30
Received 7 Likes on 4 Posts
S550 4Matic
Shipping time

They tell me that it will take about 3 weeks to get the car to Las Vegas. It's probably similar to SF.
Old 06-05-2019, 05:43 PM
  #441  
Member
 
DaveD9's Avatar
 
Join Date: Jul 2016
Location: Western NY
Posts: 159
Received 31 Likes on 27 Posts
GLE 450 / E450 Cabriolet
Not sure the VIN means anything regarding delivery. Mine is 6455 and I took delivery on 4/18.
Old 06-05-2019, 08:34 PM
  #442  
Junior Member
 
Betsyg825's Avatar
 
Join Date: Jun 2019
Posts: 23
Received 2 Likes on 2 Posts
Gle350
I ordered in February, no E-ABC. The delay without any notice of when it might be delivered is maddening.
Old 06-05-2019, 08:38 PM
  #443  
Super Member
 
Skizz's Avatar
 
Join Date: Nov 2014
Location: Dallas
Posts: 531
Received 85 Likes on 69 Posts
'20 GLE450; '06 CL65
Ordered mine in Feb. for 1st decade April build. Just today I got assigned a VIN with a production started status. Still don't know if that means anything. Just when I had settled on buying a new full size rover. I'm sure its just MBUSA screwing with me; now it'll probably be another two months of no info. Just when I'm about to get out, they keep pulling me back in.......
Old 06-05-2019, 08:40 PM
  #444  
Junior Member
 
Betsyg825's Avatar
 
Join Date: Jun 2019
Posts: 23
Received 2 Likes on 2 Posts
Gle350
I contacted customer care and they don’t care. Tell you to call your dealer.
Old 06-05-2019, 08:42 PM
  #445  
Super Member
 
Skizz's Avatar
 
Join Date: Nov 2014
Location: Dallas
Posts: 531
Received 85 Likes on 69 Posts
'20 GLE450; '06 CL65
Originally Posted by Betsyg825
I contacted customer care and they don’t care. Tell you to call your dealer.
Yeah, that's a huge waste of time and, really, an insult.
The following users liked this post:
Sharon Bishop (06-10-2019)
Old 06-05-2019, 09:39 PM
  #446  
Member
 
beth22's Avatar
 
Join Date: Dec 2018
Posts: 189
Received 12 Likes on 9 Posts
2018 GLS 450, 2018 GLE 4matic
Originally Posted by Skizz
Ordered mine in Feb. for 1st decade April build. Just today I got assigned a VIN with a production started status. Still don't know if that means anything. Just when I had settled on buying a new full size rover. I'm sure its just MBUSA screwing with me; now it'll probably be another two months of no info. Just when I'm about to get out, they keep pulling me back in.......
Which rover had you settled on?
Old 06-06-2019, 12:34 AM
  #447  
Super Member
 
Skizz's Avatar
 
Join Date: Nov 2014
Location: Dallas
Posts: 531
Received 85 Likes on 69 Posts
'20 GLE450; '06 CL65
Originally Posted by beth22
Which rover had you settled on?
I had decided to do the td6 HSE; got a really decent deal on one mostly loaded and was just about ready to pull the trigger. Then when I had to run down to Austin for two days, I started thinking about the supercharged v8. Then when I got back today and was going to head to the dealer to pick one and put a fork in it, my MB SA called and told me about the status change on the GLE. Now I am headed to Portland for a week, so I'll see what's what when I get back. I probably would have just stuck with the rover, but the tech is lagging, comparatively speaking, and the electronic gremlins have put me off. However, the wife has a 2014 LR4 and loves it; it has behaved well these last five years, and she's pushing me to get the full size rover. At the end of 2018 I was targeting the cayenne, but man, the value just wasn't there for me. The GLE seemed to have been the most well rounded option, so I ordered one just the way I wanted it. I just can't get it in my driveway. These damned first-world problems of mine.
Old 06-06-2019, 07:48 AM
  #448  
Member
 
beth22's Avatar
 
Join Date: Dec 2018
Posts: 189
Received 12 Likes on 9 Posts
2018 GLS 450, 2018 GLE 4matic
Skizz, I too was looking at other things (X5), but I have decided to wait on the 450.
Old 06-06-2019, 08:16 AM
  #449  
Senior Member
 
tinman831's Avatar
 
Join Date: Mar 2019
Posts: 330
Received 69 Likes on 51 Posts
2020 GLE
While waiting I keep optioning out an X5 and Cayenne to see what the prices are. For what you get, the GLE is a bargain. I’m still holding out...for now.
Old 06-06-2019, 10:19 AM
  #450  
Junior Member
 
rm50's Avatar
 
Join Date: Dec 2018
Location: Las Vegas
Posts: 17
Received 3 Likes on 3 Posts
GLE450 Ordered 12/11 Build date Mar 3rd decade, Mar 1st decade, 4/27 now 5/3
We were looking really hard at a Land Rover. It was a 4 month wait for delivery. We are gambling that MB will fix their problem and we will get our GLE in the next 4 months...