Production/Order codes? What is A4?
My order was finally accepted to Netstar and have a production number. The status is currently A4. What does that mean? How long does it typically stay in this status?
What is the next status code I should expect, what does it mean and how long should it stay at this status? Etc...
At what status does it go from green to yellow and then when does it go to red?
My decade planned, decade scheduled and prod date all read 20/04-3. So this would be the last 3rd 10 days of April. But I'd like to get an idea of how a build would typically go along (I know there could be delays).
Just an excited, almost 1st time Mercedes owner. Sorry I've got so many questions. Thanks all!
My order was finally accepted to Netstar and have a production number. The status is currently A4. What does that mean? How long does it typically stay in this status?
What is the next status code I should expect, what does it mean and how long should it stay at this status? Etc...
At what status does it go from green to yellow and then when does it go to red?
My decade planned, decade scheduled and prod date all read 20/04-3. So this would be the last 3rd 10 days of April. But I'd like to get an idea of how a build would typically go along (I know there could be delays).
Just an excited, almost 1st time Mercedes owner. Sorry I've got so many questions. Thanks all!
Those are estimated dates and can (and most likely will) change.
I'm still waiting for my order. Originally slated for delivery in December then got pushed to January and now it's February and it's still not built. Current estimate now show 2/12/2020 as the estimated production date.
Next code is likely B3 when you can no longer make changes to the order. Mine has been at B3 since 12/20/2019
Last edited by thenew3; Feb 5, 2020 at 03:30 PM.
Trending Topics




The Best of Mercedes & AMG
The VIN was assigned and production started on 01/31/2020. Can anyone give an overview of what happens in the 5 days from start of production to becoming ready to deliver? And what about prior to start of production? Are components for the specific build being collected and stockpiled? Seats being upholstered in the required material? Build specific items assembled?
Thanks, Greg
Last edited by Greg Dyck; Feb 7, 2020 at 02:02 PM.




Thanks, Greg
Last edited by GregW / Oregon; Feb 8, 2020 at 03:51 PM.




My 580 sat in the factory prep center for 3-5 days and I’m not sure why. I did order the roof spoiler which is considered a “dealer installed” option but was actually done in the factory. So I’m guessing that getting a color matched spoiler may have caused a little delay. I’m not sure what else they do in prep but they forgot to install the window sticker.