Production delays/ timeline
My Sales person is quite inept with Netstar though, so I don't know the exact status...
At least up until Monday the date hasn't slipped yet so hopefully everything is on track.
Decade Planned - 19/07-2
Decade Scheduled - 19/08-1
Est Prod Date - 8/29/2019
Status - B3-X-10 PROD
VIN - Not assigned
Is Est Prod date the date that production is meant to start or end? My SA says it will start on 8/29 and that's why i don't have a VIN # and it will be around 8/29 if all goes well that we should see a VIN. But recent posts make me think otherwise.




Decade Planned - 19/07-2
Decade Scheduled - 19/08-1
Est Prod Date - 8/29/2019
Status - B3-X-10 PROD
VIN - Not assigned
Is Est Prod date the date that production is meant to start or end? My SA says it will start on 8/29 and that's why i don't have a VIN # and it will be around 8/29 if all goes well that we should see a VIN. But recent posts make me think otherwise.
I have wrapped my head around just waiting for my second order even if the first one is completed earlier because I no longer trust that the first order will up to MB standards.
The Best of Mercedes & AMG
Only a month extra (hopefully), but still annoying. I wonder if now having a specific date (17th) increases confidence versus just having a decade.At first, after the allocation in April, production was scheduled for first decade in August, but I caught an error (they "accidentally" removed e-ABC, I was vigilant about checking thanks to this forum). When they readded it, the date shifted to second decade in August, then in early August it became September 17, and now September 23.
Hopefully this is the last slippage, but I'm not holding my breath.
the fact your car shows as not built is probably not exactly true. It’s just not updated bc it’s not even done yet. I will try to get out to an area they are holding them at I’m told it looks amazing to see all the cars just sitting there. It’s a public area at an old mall so getting pics should be easy.
side note check the gls 167 section to see a crude mock up of the new AMG steering wheel




the fact your car shows as not built is probably not exactly true. It’s just not updated bc it’s not even done yet. I will try to get out to an area they are holding them at I’m told it looks amazing to see all the cars just sitting there. It’s a public area at an old mall so getting pics should be easy.
side note check the gls 167 section to see a crude mock up of the new AMG steering wheel
https://www.automobilwoche.de/articl...-zurueckhalten
As far as I understand, nothing really new in this article, except that we now know which are the suppliers responsible of such delays (SMP and Lear) and which parts (seats and bumpers). However, someone on a German forum made the following additional comment based on information from an MB insider (translation in English as best as I could due to the difficulty of the German language):
"Mr. Trump wants that Mercedes only order to American suppliers.
This is not enough:
1. For the mass of orders in pieces of the GLE.
2. The quality requirements can not be provided by the American supplier as desired.
3. The German Minister of Finance was on-site to solve the problem and asked German engineers to be sent to help to America. Mr. Trump wanted the other way round and wanted to send American engineers to Germany."








Reorder is the only way to get a change made....
And they also advised to re order the car might even show up earlier.




















