Header Project...
it is still in the works, as i have been waiting on some designs to come back right now...it is a slow, tedious process that is driving me absolutely crazy!
BUT, i know that you will be very pleased with the results...i can not disclose what i have in the works right now, but i promise it will be worth the wait!
thanks for hanging in there...
as soon as that is done, i will meet with a fabricator to get the prototype produced and test it on my car...
i will keep you updated as i have information...
i met with the designer tonight (first time we have been able to actually sit down and talk in a month) and i am very pleased with the design direction...
He will have a design submitted to me to approve by the weekend...
then i will meet with a fabricator when i get back from chicago next week...
so what does all of this mean? i should have an actual prototype to put on the car by the 18th of august...
i will keep you posted as i have info...
The Best of Mercedes & AMG
thanks for your interest!

hoping that it's a "shorty" set-up though, as we do have annual inspections here in PA - I also like the idea of mods that are fairly "bolt-on" and therefore relatively easy to convert back to stock, if ever need be...
so I'll be one (of the many...) anxiously awaiting further info next week!
Cya...

hoping that it's a "shorty" set-up though, as we do have annual inspections here in PA - I also like the idea of mods that are fairly "bolt-on" and therefore relatively easy to convert back to stock, if ever need be...
so I'll be one (of the many...) anxiously awaiting further info next week!
Cya...
He is going to do a little research on material and get back to me at the beginning of the week. once he does, then i will place an order for the appropriate material and we will get together to fabricate the headers.
the time table that i am looking at to have a prototype set done and on the car is 2-3 weeks, mainly because i have a feeling it will take that long to get all of the material together (mainly the flanges produced)...he is ready to do it and can get together with me whenever once i have all of the materials gathered for the prototype set...
i will continue to update this as i have information...
He is going to do a little research on material and get back to me at the beginning of the week. once he does, then i will place an order for the appropriate material and we will get together to fabricate the headers.
the time table that i am looking at to have a prototype set done and on the car is 2-3 weeks, mainly because i have a feeling it will take that long to get all of the material together (mainly the flanges produced)...he is ready to do it and can get together with me whenever once i have all of the materials gathered for the prototype set...
i will continue to update this as i have information...



Whenever you deem them to be ready, I'll be busting a knuckle or two!






